November 2018
- In November 2018, H2O energija supplied hydraulic design and mechanical design consultancy for Project Ngoi Phat, Pelton vertical 4 jet turbine. Project will be constructed by company Flovel Energy Privat Limited, India. Power output 13600 kW.
August 2018
- In August 2018, H2O energija supplied hydraulic design and mechanical design consultancy for Project SEDE II, Francis horizontal turbine. Project will be constructed by company Hacker industrial, Brazil. Power output 3800 kW.
February 2018
- In February 2018, H2O energija supplied hydraulic design for Project ITAPOCUZIHNO II, Pelton 3 jet horizontal turbine. Project will be constructed by company HISA/WEG, Brazil. Power output 6500 kW.
January 2018
- In January 2018, H2O energija supplied hydraulic design for Project COVO HPP, Francis horizontal turbine. Project will be constructed by company HISA/WEG, Brazil. Power output 2800 kW.
May 2017
- Project Louros HPP , Greece
- H2O energija suplied hydraulic design and report on turbine tested characteristics for complete renovation and modernisation of 3 x horizontal Francis turbine.
Project data:
3 x horizontal Francis turbines ns 235
Nominal output / turbine = 3 MW
Head = 54,40 m
Flow = 5,35 m3/s
Runner = 870 mm
3 x horizontal Francis turbines ns 235
Nominal output / turbine = 3 MW
Head = 54,40 m
Flow = 5,35 m3/s
Runner = 870 mm
July 2016
- Project „ Narmada canal“ developed for Sardar Sarovar Narmada Nigam Ltd, India,
- H2O energija suplied hydraulic design and report on turbine tested characteristics for 7 x „S“ type horizontal.
Project data:
- 7 x S type Kaplan turbines ns 834
- Nominal output / turbine = 850 kW
- Head = 4 m
- Flow = 22 m3/s
- Runner = 2900 mm
January 2016
- Project KW Gries for Verbund GmbH.
- H2O energija suplied hydraulic design and report on turbine tested characteristics for 2 x vertical Kaplan. Suplied design was additionally tested, verified and approved by TU Graz.
Project data:
- 2 x vertical Kaplan turbines ns 601
- Nominal output / turbine = 4,65 MW
- Head = 8,9 m
- Flow = 50 m3/s
- Runner = 3150 mm
October 2013
- Project Guanhães for Compahia Energética de Minas Gerais, Brazil
- H2O energija suplied hydraulic design and report on turbine tested characteristics for 3 x vertical Kaplan and 1 x horizontal Francis turbine.
Project data Kaplan:
|
Project data Francis:
|
|
|